|
|
555a836d90
|
docs: iteration 22 plan ready; slice active
- plan 2026-08-21-db-bench.md: 6 tasks (time.ticks builtin, sample,
concurrent modes, driver+gate, first baseline + gate-bites proof,
closeout); words + verification commands per convention
- spec banner APPROVED; story 22 to in-progress/ (frontmatter synced);
marker doc created; board standup/rows/pending updated
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
|
2026-08-21 16:07:51 +02:00 |
|
|
|
49cc734ae8
|
docs: arc closeout (T8) — stage 3 landed, chain advances to 22
- stories 08+11 to done/ with banners (11: fs-park re-scoped out of
v1, disclosed); guarantee-contract table re-homed in story 08;
marker doc deleted per convention
- board standup: implemented/findings/learned/unblocked/next/.dev-ref
for the landing; In-progress = nothing active, next = 22 spec
- arc plan status ARC COMPLETE, T7/T8 boxes checked with deviations;
graph nodes done; framework ledger rows note arc-unblocked;
18's pub/sub rejection expired note
- CODE-LOGIC: runtime DB-actor + ring-params section, database slot
surface; oop-vm/03 contract gains the reply-park protocol
- 22 precursor recorded: remote insert ~8us/op RAM-only
- full battery + db-actor gate green after doc edits; links verified
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
|
2026-08-21 13:16:25 +02:00 |
|