- done/ (11): 1, 2, 3, 4, 6, 7, 7b, 9, 9b, 15, 16 — landed iterations
(9/9b remainders live in the post-12 drain list, not in the files)
- refine/ (8): 9c, 9d, 9e, 9f, 9g, 11, 13, 14 — everything marked
"no spec yet / brainstorm before planning"
- root keeps: 00-story (index), 05 (partial, plan 8 open), 8/10/12
(specs or plans exist), 17 (parked, spec+plan approved), 18 (next)
- every cross-reference re-pathed and VERIFIED resolving: board, specs,
plans, employee-list README, story table, intra-story links (moved
files' relative links deepened one level; done/7b's 9e pointer now
crosses to refine/)
- pre-existing dead link noted, not touched: refine/11-fibers.md points
at docs/plan/exploration/fibers/00-fibers.md which does not exist
(predates the move)
Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
- NEXT PLAN rewritten: iteration 17 is the goal slice (merge branch, spec/
plan, kind = "library", internal/ WO-E1xx, framework reorg, gate list)
- previous NEXT PLAN retitled "Landed 2026-08-15 — the executable milestone";
all six measured items were already done, board rows were stale
- board row 7: in-progress -> landed 2026-08-15 (ASan-clean, SIGTERM, fd-flat,
soak, just log-watcher 7/0); iteration 07 story banner updated to match
its plan doc's done banner
- in-progress table now carries iteration 17 spec/plan
- implementation order re-sequenced for framework goal: 17, 9c/9d, 9e, 8,
9f, 11 (+ h2c unparks), 10, 12, then 14/9g demoted (skillhost no longer
the driving workload), 13 + parked drain last
- story notes record the shift and the new order
Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
Every remaining item is now traced to a measurement on the sample; anything the
sample does not exercise is deferred by name with the measurement that says so.
- new plan docs/plan/compiler/2026-08-14-logwatcher-executable.md — six tasks
between "it runs" and "you can leave it running": the ownership pass learning
stdlib return types (>1 MB leaked in 8s of `run` mode, one fs.read_all
result), dropping a projected temporary (`for e in parse_dir(d).entries`
leaks the shell per rescan), the runtime's own argv container (128 B every
run), honouring the stop signal in blocking calls (a server in accept ignores
SIGTERM), closing accepted connections (net.close exists, unused), and a soak
that would have caught all of it. Opens with the measured starting point and
closes with an explicit out-of-scope list
- story 7 (log-watcher proof): status banner separating the met compile-and-run
half from the executable half, plus a new Given/When/Then — clean SIGTERM
exit, zero leaks, flat RSS and descriptors across a soak
- story 5: grammar half landed, strictness half deliberately deferred
- story 6: landed for the surface the workload uses, with the two lifetime
defects it exposed pointed at the new plan
- story 7b: recorded as off this workload's path, measured — the sample has no
@gc class, 0 RC_INC/RC_DEC against 78 DROPs
- 00-status.md: NEXT PLAN is the executable list; story table and in-progress
row point at the new plan; deferrals carry their evidence
- plan 8 (haxe-parity): banner now says on hold behind the executable plan, and
its task states are corrected — Task 5 shipped, Tasks 6 and 7 are half done
Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>