8992dbd589 docs(rv2-tls): rv2 9 COMPLETE (both directions); retire proxy doctrine; jarvis-after-porch
- rv2 9 story -> status: done. §G G3 landed; ladder A–G complete, live-gated
  both directions (just tls 5/0, just tls-server 4/0). review_pending +
  phase rows + G sub-phases updated
- doctrine retired where the story named it: language 34 ("TLS permanently
  the proxy's job"), language 38 ("proxy-terminated ... no HTTPS clients"),
  porch 00-story ("TLS ... proxy-terminated") — each corrected to point at
  in-process TLS (net.connect_tls / net.accept_tls)
- status board: rv2 9 row DONE + a top summary; NEXT PLAN = porch then
  jarvis (sequencing set: jarvis follows porch)
- jarvis 00-story: sequencing note (no longer runtime-blocked; porch first)
- CODE-LOGIC: the inbound-server section (net.accept_tls, signing, slot
  refactor, RST-drain, gate)

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
(cherry picked from commit f3a3c962e5f288c25e505851edef4e0a5df9a85f)
2026-09-15 01:16:13 +02:00
18e0e6992b docs(rv2-tls): phase G2 server FSM landed
§G sub-phase G2: the sans-io server handshake FSM (wo_tls_server) landed,
loopback-KAT'd against the client driver (EC + RSA identities, app
round-trip). Remaining G3: net.accept_tls + private-key parse + live gate.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
(cherry picked from commit 57613bddc621a90970d9443ae5a5deacffe0cfca)
2026-09-15 01:15:52 +02:00
cd779afa7f docs(rv2-tls): phase G1 signing landed (RSA-PSS + ECDSA-P256)
§G sub-phase G1: constant-time RSA-PSS + ECDSA-P256 signing landed and
KAT'd (RSA vs python from-spec; ECDSA vs RFC 6979 A.2.5). Remaining G1c
(private-key PEM/DER parse) folded into G3 (which reads key files); the
server FSM takes raw key material.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
(cherry picked from commit f02518cdabab02043a04c6bdd28a81b86bb9fbd4)
2026-09-15 01:15:52 +02:00
82446652e4 docs(rv2-tls): brainstorm phase G (inbound TLS server) to ready
- §G written to READY (forks auto-approved, review_pending): the inbound
  server rung. Grounds what's reused (record layer, role-symmetric key
  schedule, X.509, slot table + data plane) vs new (server FSM, signing,
  key parsing, accept surface)
- six locked decisions: (1) constant-time private-key ops — the built
  modexp/scalar-mult are verify-only, not constant-time, so G adds a
  constant-time fixed-window modexp + Montgomery-ladder scalar mult;
  (2) both RSA-PSS + ECDSA-P256 server keys; (3) deterministic RFC 6979
  ECDSA nonce; (4) net.accept_tls(listener,cert,key) w/ per-path shard
  identity cache; (5) full 1-RTT server-auth only (no mTLS/resumption/HRR);
  (6) sans-io wo_tls_server FSM
- sub-phases G1 signing+key-parse, G2 server FSM (loopback KAT), G3
  net.accept_tls + live gate (openssl s_client); acceptance + out-of-scope
- ladder G row -> READY; may become its own runtime-v2 iteration

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
(cherry picked from commit 9fcb4a96a137a897f0ce2be868c18e63a979c997)
2026-09-15 01:15:52 +02:00
cf31bb4ebd docs(rv2-tls,jarvis,status): outbound TLS client complete — jarvis unblocked
- rv2 9 §F3c-net marked LANDED + live-gated; phase-F row COMPLETE (client);
  frontmatter review_pending updated (client complete, remaining = G server
  + deferred park-handshake/TlsConn/pooling + doctrine-doc corrections)
- jarvis 00-story + 01: the outbound-TLS blocker is cleared
  (net.connect_tls landed) — jarvis 1 (chat loop) is now buildable
- status board: rv2 9 row + NEXT PLAN rewritten to the completed client;
  next step is jarvis 1 or rv2 9 G

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
(cherry picked from commit 732c2216b501dd226d306f9abcbd1ddd846809dc)
2026-09-15 01:15:52 +02:00
53485a748c docs(rv2-tls): lock two more F3c-net requirements from the gofiber/Go comparison
Compared §F3c-net's forks against gofiber v3's client (fasthttp + Go
crypto/tls/x509, .dev/reference/fiber). Two gaps my defaults had vs Go,
now locked as decisions 5 and 6:

- (5) bounded handshake deadline: the blocking model would let a stalled
  server hang the shard's one thread indefinitely (the DoS DoTimeout
  closes). connect_tls now bounds connect+handshake via non-blocking
  connect+poll + SO_RCVTIMEO/SNDTIMEO, default WO_TLS_HANDSHAKE_MS
  (10s); expiry traps WO_T_IO. _dl variant + park handshake stay follow-ups
- (6) chain hardening: signatures+validity+SAN alone let a leaf act as a
  CA. Now every non-leaf must assert basicConstraints CA:TRUE (+pathLen)
  and the leaf must carry EKU serverAuth — what Go's crypto/x509 enforces
- acceptance criteria added (stalled-server timeout; leaf-as-CA + no-EKU
  rejected); connect_tls bullet, frontmatter review_pending, status NEXT
  PLAN updated to six locked forks

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
(cherry picked from commit 9662cd8b040f417b4886dae9ce97b70083e24e40)
2026-09-15 01:15:31 +02:00
f1e355c4d4 docs(rv2-tls): brainstorm §F3c-net to ready — four integration forks locked
- §F3c-net rewritten to READY (decisions locked 2026-09-09), grounded in
  the runtime not assumed:
  1. blocking connect+handshake then park the data plane (mirrors
     net.connect's own "tolerable while rare" stance); park-based
     handshake a named follow-up
  2. per-shard fd-keyed wo_tls_conn slot table, no locks (the wo_child /
     one-thread-per-shard pattern); slot holds driver state + partial-record
     + leftover-plaintext buffers
  3. failures trap WO_T_IO loudly incl. chain + hostname (no silent nil)
  4. per-shard lazy read-only CA bundle (/etc/ssl/certs, WO_CA_BUNDLE)
- builtin surface: net.connect_tls/read_tls/write_tls (ids 115-117,
  WO_B_MAX->117), acceptance criteria (incl. concurrent-shard TSan),
  out-of-scope (park handshake, TlsConn object, HTTP layer, inbound G)
- frontmatter review_pending + phase-F row + status NEXT PLAN updated:
  F3c-net spec ready, next action is BUILD (live-gated)

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
(cherry picked from commit 8b6e72171c5db9dfe5b7a5122be123bf7cc3cdd9)
2026-09-15 01:15:31 +02:00
2391553658 docs(rv2-tls,status): F3c-net plan + net.connect_tls object-model default; session NEXT PLAN
- rv2 9 §F3c-net: the remaining live-gated slice with auto-approved
  defaults — getrandom ephemeral, system CA-bundle loader, net.connect_tls
  builtin returning the TCP fd (fd-keyed side table, blocking model like
  net.connect) driving the sans-io driver, then wo_tls_verify_chain; plus
  net.read_tls/write_tls and a live gate
- status board NEXT PLAN: the TLS client security engine landed this
  session (E-F3c minus socket glue), F3c-net is the next rung, then jarvis

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
(cherry picked from commit ad87974fc722268e278f957f1f3d607f5dafa50d)
2026-09-15 01:15:31 +02:00
ad088163cc docs(rv2-tls,jarvis): TLS ladder through F3c-core + SAN landed
- rv2 9 phase-F row + review_pending: F3c-core sans-io driver + SAN/host
  landed (KAT'd vs RFC 8448 record trace); remaining F3c-net = system CA
  trust-anchor walk + net.connect_tls VM plumbing (live-gated), then G
- jarvis 00-story + 01 blocker tables: crypto/handshake engine landed;
  jarvis now waits only on net.connect_tls (the socket glue)
- status board rv2 9 row updated to the full ladder state

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
(cherry picked from commit 4fdf07196d01c32d0ab12d32d36fa4285ff34654)
2026-09-15 01:15:31 +02:00
c84d33c9ba docs(rv2-tls): rv2 9 phase F1-F3b landed (record, key schedule, messages, offline verify)
- phase-F row: F1 record layer, F2 key schedule, F3a message layer,
  F3b offline handshake verification all landed + KAT'd (RFC 8448 /
  real certs); F3c socket FSM + net.connect_tls plumbing remaining
- review_pending updated to the current ladder state

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
(cherry picked from commit d49bc3866b6b620d00a8a57137ba211da25cd05b)
2026-09-15 01:15:31 +02:00
bb64278aa9 docs(rv2-tls): rv2 9 phase E (X.509 core) landed
- phase-E ladder row: core landed (DER reader + cert parse + verify_one
  + parse_spki + check_validity), KAT'd on real RSA + EC chains
- review_pending frontmatter: forks auto-approved 2026-09-08, SAN/
  hostname + CA-bundle walk deferred to phase F

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
EOF2
git log --oneline -2

(cherry picked from commit 796ed88d76f1cf25ced1eb5e7bdb4e4ab3cf4e9b)
2026-09-15 01:15:31 +02:00
ca572086ee docs(rv2-tls): rv2 9 phase D complete (RSA + ECDSA-P256 verify)
- ECDSA-P256 verify landed; phase D done (both signature verifiers)
- rv2 9 story, board ladder, jarvis 00-story deps, and dependency-graph §7
  synced: A-D landed, E-F remain

(cherry picked from commit 3eab98cc268e524c7b4e2ab72a4b093692a67d03)
2026-09-15 01:15:31 +02:00
4e70509001 docs(rv2-tls): rv2 9 phase D part 1 (RSA verify) landed
- RSA PKCS#1 v1.5 + PSS verify over SHA-256, bignum Montgomery modexp,
  KAT-gated vs python RSA-2048. ECDSA-P256 (D2) remains. Board synced

(cherry picked from commit ae42943c97949224d883e9ddcf5ae2117fef62b3)
2026-09-15 01:15:31 +02:00
8e652800fe docs(rv2-tls): rv2 9 phase C (X25519) landed
- constant-time X25519 (RFC 7748), curve25519-donna radix-2^51; KAT-gated incl.
  the 1000-iteration vector. Ladder A+B+C done; next D. Board synced

(cherry picked from commit b929a20b7482d7137a45b77a2179fe7ef03c52b6)
2026-09-15 01:15:31 +02:00
aff8ffdf14 docs(rv2-tls): rv2 9 phase B (HKDF key schedule) landed
- HKDF-Extract/Expand + Expand-Label over hmac_sha256, KAT-gated (RFC 5869 +
  8446); status -> in-progress; ladder A+B done. Board synced

(cherry picked from commit e24b8ec6d838fc66848864c2a0974205aaa9b4be)
2026-09-15 01:15:31 +02:00
51addb504c docs(rv2-tls): brainstorm runtime-v2 9 (in-process TLS) to ready — hand-rolled
- decision: HAND-ROLL TLS 1.3 (no vendored lib) per developer call; keeps the
  zero-external-dep single binary, and raises risk rather than lowering it —
  recorded, owned, with mandatory mitigations
- 1.3-only; RSA-PSS/PKCS1 + ECDSA-P256 + full ASN.1/X.509 chain validation +
  trust store + hostname (the scope needed to reach real LLM APIs)
- decomposed into a bottom-up phase ladder: A AEAD (=rv2 8, forces AES-GCM
  there) -> B HKDF -> C X25519 -> D signatures/RSA -> E X.509 -> F record+FSM
  client -> G inbound server; C/D/E may each split into own iterations
- risk + test strategy section: constant-time, reference-tested (openssl +
  RFC 8448 vectors), negative tests first-class, no partial-trust states
- deps: rv2 8 (AEAD), lang 34 (SHA/HMAC), net.connect (110, landed). Board synced

(cherry picked from commit f1881cca8cd0cdd58b1ac844e3e3ea9c234bb99c)
2026-09-15 01:15:31 +02:00
cc1c82b2ef docs: jarvis track, runtime-v2 7/8/9, lang-41 fix design, fiber scope-gap
- jarvis (00-story): 6th track, 2nd software built with writeonce — an AI
  assistant; direct-HTTPS design; blockers named (net.connect + TLS)
- runtime-v2 7 observability + 8 symmetric cipher: moved from the language
  track (were 30/43); 9 in-process TLS: created from the gap jarvis surfaces,
  RETIRES the "TLS is the proxy's job" doctrine (both directions)
- language 41 (arena hang): fix design to ready — marshal cross-shard
  messages (root), align the shard_id % nshards route/compare + assert bound;
  poison-on-free + minimal fixture as follow-ups
- fiber scope-gap analysis (plan/exploration/fiber/01): porch vs fiber, what
  porch lacks, would developers prefer porch
- board + dependency-graph synced (porch 2-8 ready; rv2 table; §5/§5a graphs)

(cherry picked from commit 203470ceb2a151fe3584931cd4237af3f96a9f29)