writeonce/docs
shoney.arickathil 5a9c11bfa8 docs: arc closeout (T8) — stage 3 landed, chain advances to 22
- stories 08+11 to done/ with banners (11: fs-park re-scoped out of
  v1, disclosed); guarantee-contract table re-homed in story 08;
  marker doc deleted per convention
- board standup: implemented/findings/learned/unblocked/next/.dev-ref
  for the landing; In-progress = nothing active, next = 22 spec
- arc plan status ARC COMPLETE, T7/T8 boxes checked with deviations;
  graph nodes done; framework ledger rows note arc-unblocked;
  18's pub/sub rejection expired note
- CODE-LOGIC: runtime DB-actor + ring-params section, database slot
  surface; oop-vm/03 contract gains the reply-park protocol
- 22 precursor recorded: remote insert ~8us/op RAM-only
- full battery + db-actor gate green after doc edits; links verified

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-08-21 13:16:25 +02:00
..
.obsidian docs: arc closeout (T8) — stage 3 landed, chain advances to 22 2026-08-21 13:16:25 +02:00
examples docs: arc closeout (T8) — stage 3 landed, chain advances to 22 2026-08-21 13:16:25 +02:00
plan docs: arc closeout (T8) — stage 3 landed, chain advances to 22 2026-08-21 13:16:25 +02:00
stories docs: arc closeout (T8) — stage 3 landed, chain advances to 22 2026-08-21 13:16:25 +02:00
superpowers docs: arc closeout (T8) — stage 3 landed, chain advances to 22 2026-08-21 13:16:25 +02:00
00-code-review.md docs: status board moved to docs/stories/00-status.md 2026-08-21 10:07:20 +02:00
00-dependency-graph.md docs: arc closeout (T8) — stage 3 landed, chain advances to 22 2026-08-21 13:16:25 +02:00
00-link-audit.md feat: iterations 19 + 17 — Float/Bytes scalars (.wob v5), library kind + internal/ 2026-08-20 19:24:15 +02:00
00-principles.md docs: principles — repoint 4 dead Rust-era links 2026-08-21 06:02:25 +02:00
01-problem.md docs: remove stale old-runtime docs; abandon the ##ui frontend track 2026-08-17 20:06:36 +02:00
08-project-structure.md docs: status board moved to docs/stories/00-status.md 2026-08-21 10:07:20 +02:00
Untitled.base docs: arc closeout (T8) — stage 3 landed, chain advances to 22 2026-08-21 13:16:25 +02:00