- stories 08+11 to done/ with banners (11: fs-park re-scoped out of v1, disclosed); guarantee-contract table re-homed in story 08; marker doc deleted per convention - board standup: implemented/findings/learned/unblocked/next/.dev-ref for the landing; In-progress = nothing active, next = 22 spec - arc plan status ARC COMPLETE, T7/T8 boxes checked with deviations; graph nodes done; framework ledger rows note arc-unblocked; 18's pub/sub rejection expired note - CODE-LOGIC: runtime DB-actor + ring-params section, database slot surface; oop-vm/03 contract gains the reply-park protocol - 22 precursor recorded: remote insert ~8us/op RAM-only - full battery + db-actor gate green after doc edits; links verified Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
11 lines
348 B
JSON
11 lines
348 B
JSON
{
|
|
"id": "obsidian-kanban",
|
|
"name": "Kanban",
|
|
"version": "2.0.51",
|
|
"minAppVersion": "1.0.0",
|
|
"description": "Create markdown-backed Kanban boards in Obsidian.",
|
|
"author": "mgmeyers",
|
|
"authorUrl": "https://github.com/mgmeyers/obsidian-kanban",
|
|
"helpUrl": "https://publish.obsidian.md/kanban/Obsidian+Kanban+Plugin",
|
|
"isDesktopOnly": false
|
|
}
|