- Board renamed docs/plan/00-kanban.md -> docs/00-status.md and rebuilt: ▶ NEXT PLAN pointer (iteration 4 — emitter, corpus, `woc build`) then six buckets — stories, in progress, done, pending, discarded, learnings. It covered only the Rust runtime before, so the whole OOP track was invisible. All 16 inbound refs repointed; `Kanban:` banners renamed to `Status:`. - New discarded.md (settled rejections with reasons: inheritance, `abstract`, Money/SKU/Float, Dynamic/cast/macro/extern, AOT-to-C, Menhir, shared engine state) and learnings.md (plumbed≠enforced, vacuous goldens, exit-0-wrong- output, malloc-path ASan trick, deferred checks that never reach the VM). - RECOVERED docs/plan/exploration/blue-green-vm/00-vision.md — gone from disk, never committed (gitignored path), cited by five docs incl. principle 12. Root cause was broader: all seven forward-roadmap plans in docs/superpowers/plans/ were untracked and ignored, on one disk only. Dropped the docs ignore rules with a do-not-re-add note; added __pycache__/*.pyc. - Repaired broken links across docs/, 270 -> 36: fixes a regression from the earlier reference/ -> .dev/reference/ move (relative paths at ../../ and deeper were skipped), plus depth and reorg drift. The 36 residual point at content that does not exist and need decisions, not paths. - New spec docs/superpowers/specs/2026-08-10-logwatcher-gap-closure-design.md, applied: `and`/`or` verdict row; Part 3 gains `env` (six modules), swaps time.mono for iso/local, adds 22 bare core builtins; throw/time.mono/is cut (0 uses in the sample). Plan 8: Task 2 gains and/or, Task 5 drops throw, abstract+`is` task deleted, 8/9 renumber to 7/8. Plan 9 gains core builtins. Plan 10 gains the 307 -> 0 diagnostic gate. WO-E205 re-filed unreachable-by- design. types.ml header drops its false satisfaction-set claim. 00-code- review.md reduced to a stub — its rival Phase 1-4 roadmap retired.
8 lines
495 B
Markdown
8 lines
495 B
Markdown
# Code Review: log-watcher Compilation Requirements
|
||
|
||
This document was a gap analysis of what the `woc` front end needs before the
|
||
log-watcher sample compiles. Its findings were extracted on 2026-08-10 into
|
||
[`superpowers/specs/2026-08-10-logwatcher-gap-closure-design.md`](superpowers/specs/2026-08-10-logwatcher-gap-closure-design.md)
|
||
and the plans it amends; its Phase 1–4 roadmap is retired in favour of the
|
||
approved story iterations. See [`00-status.md`](00-status.md) for current
|
||
status.
|