writeonce/docs/stories/porch
shoney.arickathil 8992dbd589 docs(rv2-tls): rv2 9 COMPLETE (both directions); retire proxy doctrine; jarvis-after-porch
- rv2 9 story -> status: done. §G G3 landed; ladder A–G complete, live-gated
  both directions (just tls 5/0, just tls-server 4/0). review_pending +
  phase rows + G sub-phases updated
- doctrine retired where the story named it: language 34 ("TLS permanently
  the proxy's job"), language 38 ("proxy-terminated ... no HTTPS clients"),
  porch 00-story ("TLS ... proxy-terminated") — each corrected to point at
  in-process TLS (net.connect_tls / net.accept_tls)
- status board: rv2 9 row DONE + a top summary; NEXT PLAN = porch then
  jarvis (sequencing set: jarvis follows porch)
- jarvis 00-story: sequencing note (no longer runtime-blocked; porch first)
- CODE-LOGIC: the inbound-server section (net.accept_tls, signing, slot
  refactor, RST-drain, gate)

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
(cherry picked from commit f3a3c962e5f288c25e505851edef4e0a5df9a85f)
2026-09-15 01:16:13 +02:00
..
00-story.md docs(rv2-tls): rv2 9 COMPLETE (both directions); retire proxy doctrine; jarvis-after-porch 2026-09-15 01:16:13 +02:00
01-store-backed-middleware.md docs(porch-store): saturation gate leg closes out porch 1 2026-09-15 01:15:30 +02:00
02-randomness-and-cookies.md docs(porch-cookies): brainstorm story 2 (randomness+cookies) to ready 2026-09-15 01:15:30 +02:00
03-sessions.md docs(porch-csrf): brainstorm stories 3 (sessions) + 4 (CSRF) to ready 2026-09-15 01:15:31 +02:00
04-csrf.md docs(porch-csrf): brainstorm stories 3 (sessions) + 4 (CSRF) to ready 2026-09-15 01:15:31 +02:00
05-routing-response-ergonomics.md docs(porch-routing): brainstorm story 5 (routing + response ergonomics) to ready 2026-09-15 01:15:31 +02:00
06-streaming-core.md docs(porch-streaming): brainstorm story 6 (streaming core) to ready 2026-09-15 01:15:31 +02:00
07-sse-and-compression.md docs(porch-sse): brainstorm story 7 (SSE + compression) to ready 2026-09-15 01:15:31 +02:00
08-static-and-lifecycle.md docs(porch-static): brainstorm story 8 (static + lifecycle) to ready 2026-09-15 01:15:31 +02:00